Skip to content

A day of maintenance work at a nearby Primary School

The timing was good and the situation urgent: during Rhulani's quieter period before the start of the winter months, our team helped carry out much-needed repair work at the Secondary School in the nearby village of Supingstad. A defective roof was removed, eliminating a significant safety hazard, and the grass was cut so the children can enjoy playing football again.

A0b2378b 333d 4c65 b416 1899b74a3c57
4ace675f 9389 4330 83ec 5ba4ef14550e

"The damaged roof was really a big hazard. It couldn't be repaired because the underlying support structure could no longer support it," says Rhulani's manager Shade. The roof could have blown off in the next storm and caused quite a bit of damage. "The roof has been removed for now and we will see what we can do next."

Above all, the many children at the school were happy that the high grass was finally cut on their playground and they could finally play football again. Rhulani's maintenance team also brough along new paint, so here and there a fresh coat of paint was applied, which immediately gave the place a fresher and more welcoming touch.

"Our help was a drop in the bucket, but it was certainly a good start," says Shade. "There is much to do!" Above all of the toilets are not working and urgently need to be replaced. This will most probably be the subject of the next stage.

A52f7064 1b8f 4d84 bb4c 65fe4b4ecbcc

Related articles